Free program

5/3/1 program

Enter your squat, bench, deadlift and overhead press maxes: the full 4-week cycle is calculated, ready to print or export.

Also known as: Wendler 5/3/1 · 531 program · Boring But Big · training max calculator

kg
kg
kg
kg

Week 1

Day 1

  • Overhead press5@40 kg
  • Overhead press5@47.5 kg
  • Overhead press5+@52.5 kg

Day 2

  • Deadlift5@127.5 kg
  • Deadlift5@147.5 kg
  • Deadlift5+@167.5 kg

Day 3

  • Bench press5@70 kg
  • Bench press5@80 kg
  • Bench press5+@92.5 kg

Day 4

  • Squat5@105 kg
  • Squat5@122.5 kg
  • Squat5+@137.5 kg

Week 2

Day 1

  • Overhead press3@45 kg
  • Overhead press3@50 kg
  • Overhead press3+@57.5 kg

Day 2

  • Deadlift3@137.5 kg
  • Deadlift3@157.5 kg
  • Deadlift3+@177.5 kg

Day 3

  • Bench press3@75 kg
  • Bench press3@87.5 kg
  • Bench press3+@97.5 kg

Day 4

  • Squat3@112.5 kg
  • Squat3@130 kg
  • Squat3+@145 kg

Week 3

Day 1

  • Overhead press5@47.5 kg
  • Overhead press3@52.5 kg
  • Overhead press1+@60 kg

Day 2

  • Deadlift5@147.5 kg
  • Deadlift3@167.5 kg
  • Deadlift1+@187.5 kg

Day 3

  • Bench press5@80 kg
  • Bench press3@92.5 kg
  • Bench press1+@102.5 kg

Day 4

  • Squat5@122.5 kg
  • Squat3@137.5 kg
  • Squat1+@155 kg

Week 4 · deload

Day 1

  • Overhead press5@25 kg
  • Overhead press5@32.5 kg
  • Overhead press5@37.5 kg

Day 2

  • Deadlift5@80 kg
  • Deadlift5@100 kg
  • Deadlift5@120 kg

Day 3

  • Bench press5@42.5 kg
  • Bench press5@55 kg
  • Bench press5@65 kg

Day 4

  • Squat5@65 kg
  • Squat5@80 kg
  • Squat5@97.5 kg

How 5/3/1 works

Created by Jim Wendler, 5/3/1 runs off a training max (TM) at 90 % of your true max, deliberately conservative. Each 4-week cycle has three waves (5s, 3s, then 5/3/1) and a deload week.

The last set of each session is a "+" set: as many reps as possible with clean technique. That set measures progress. At the end of the cycle, add 2.5 kg to upper-body TMs and 5 kg to lower-body TMs.

Boring But Big and variants

The most popular variant, Boring But Big (BBB), adds 5 sets of 10 at 50 % of TM on the same lift: lots of volume for size and technique. It is included as an option.

Many coaches now use an 85 % TM for more margin. In CoachForce, a program like this takes minutes to build and adapts to each athlete.

Frequently asked questions

What is the 5/3/1 training max?

A reference number at 90 % of your true 1RM (85 % in some variants). Every percentage in the program applies to the TM, not the 1RM.

What does the "+" on the last set mean?

An AMRAP set: do at least the prescribed reps, then as many as you can with good form.

How long should I run 5/3/1?

As many cycles as progress continues. It is designed to be repeated for months, adding a little weight each cycle.

Is 5/3/1 good for beginners?

It works at any level, but beginners progress faster on a linear program. 5/3/1 shines for intermediates.

Is 5/3/1 good for building strength?

Yes, especially for intermediates: slow but steady progress, little risk of stalling and plenty of freedom on assistance work.

How do I calculate my 5/3/1 training max?

Take 90 % of your 1RM (85 % if you're new to the program). Every weight in the cycle comes from that training max, which the calculator handles.

How many days a week is 5/3/1?

The classic version runs 4 days, one main lift per session. 3-day and 2-day variants exist.

CoachForce

The same maths, applied to every session.

In CoachForce, each athlete's e1RM, RPE, volume and progress are calculated automatically from real training. Programs, tracking, messaging: strength coaching, properly equipped.